vlabs logo
  • HOME
  • PARTNERS
  • CONTACT
Electrical Engineering
vlabs logo
Introduction
Objective
List of experiments
Target Audience
Course Alignment
Feedback
Introduction
Objective
List of experiments
Target Audience
Course Alignment
Feedback

Substation Automation Lab

  1. Circuit Breaker Status Indication from field input
  2. Control of Group Operated Switches (GOS) from workstation
  3. Monitoring Feeder parameter from workstation
  4. Fault scenario simulation in a feeder
  5. Fault scenario simulation in a Transformer /Bus
  6. Load Transfer from one Feeder to other during Transformer Maintenance
  7. Control Of Bus Voltages Through Onload Tap Changes
  8. Development of 11KV/433 volts substation automation scheme using PLC for normal load operation
  9. Development of 11KV/433 volts substation automation scheme using PLC for timer ON/OFF load control
  10. Development of 11KV/433 volts substation automation scheme using PLC for cyclic ON/OFF load control
  11. Autoreclosure And Sectionalizer Operation
Community Links Sakshat Portal Outreach Portal FAQ: Virtual Labs
Contact Us Phone: General Information: 011-26582050 Email: support@vlabs.ac.in
Follow Us
AGPL 3.0  &  Creative Commons (CC BY-NC-SA 4.0)